Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of November 25, 2020

Title 40Chapter ISubchapter CPart 62Subpart III → Appendix


Title 40: Protection of Environment
PART 62—APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS
Subpart III—Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999


Table 4 to Subpart III of Part 62—Summary of Reporting Requirementsa

Report Due date Contents Reference
A. Waste Management PlanNo later than April 5, 2004Waste management plan§62.14715.
B. Initial Test ReportNo later than 60 days following the initial performance test1. Complete test report for the initial performance test
2. The values for the site-specific operating limits.
3. Installation of bag leak detection systems for fabric filters.
§62.14720.
C. Annual reportNo later than 12 months following the submission of the initial test report. Subsequent reports are to be submitted no more than 12 months following the previous report1. Name and address
2. Statement and signature by responsible official.
3. Date of report.
4. Values for the operating limits.
5. If no deviations or malfunctions were reported, a statement that no deviations occurred during the reporting period.
6. Highest recorded 3-hour average and the lowest 3-hour average, as applicable, for each operating parameter recorded for the calendar year being reported
§§62.14725 and 62.14730. Subsequent reports are to be submitted no more than 12 months following the previous report.
   7. Information for deviations or malfunctions recorded under §62.14700(b)(6) and (c) through (e)
8. If a performance test was conducted during the reporting period, the results of the test.
9. If a performance test was not conducted during the reporting period, a statement that the requirements of §62.14680(a) or (b) were met.
10. Documentation of periods when all qualified CISWI unit operators were unavailable for more than 8 hours but less than 2 weeks.
D. Emission Limitation or Operating Limit Deviation ReportBy August 1 of that year for data collected during the first half of the calendar year
By February 1 of the following year for data collected during the second half of the calendar year.
1. Dates and times of deviations
2. Averaged and recorded data for these dates.
3. Duration and causes for each deviation and the corrective actions taken.
4. Copy of operating limit monitoring data and any test reports.
5. Dates, times, and causes for monitor downtime incidents.
6. Whether each deviation occurred during a period of startup, shutdown, or malfunction.
§§62.14735 and 62.14740.
E. Qualified Operator Deviation NotificationWithin 10 days of deviation1. Statement of cause of deviation.
2. Description of efforts to have an accessible qualified operator.
3. The date a qualified operator will be accessible.
§62.14745(a)(1).
F. Qualified Operator Deviation Status ReportEvery 4 weeks following deviation.1. Description of efforts to have an accessible qualified operator
2. The date a qualified operator will be accessible.
3. Request for approval to continue operation.
§62.14745(a)(2).
G. Qualified Operator Deviation Notification of Resumed OperationPrior to resuming operationNotification that you are resuming operation§62.14745(b).

aThis table is only a summary, see the referenced sections of the rule for the complete requirements.