Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of November 25, 2020

Title 40Chapter ISubchapter CPart 62Subpart FFF → Appendix


Title 40: Protection of Environment
PART 62—APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS
Subpart FFF—Federal Plan Requirements for Large Municipal Waste Combustors Constructed on or Before September 20, 1994


Table 5 to Subpart FFF of Part 62—Generic Compliance Schedules and Increments of Progress

[Post-1987 MWCs]a b

Affected facilitiesIncrement 1
Submit final control plan
Increment 2
Award
contracts
Increment 3
Begin on-site construction
Increment 4
Complete on-site construction
Increment 5
Final compliance
Affected facilities that commenced construction modification, or reconstruction after June 26, 1987:
1. Emission limits for Hg, dioxin/furanNAcNAcNAcNAc11/12/99 or 1 year after permit issuanced e
2. Emission limits for SO2, HCl, PM, Pb, Cd, opacity CO, NOXJanuary 11, 199905/18/9911/16/9911/19/0012/19/00.

aTable 4 or 5 of this subpart applies to MWC units subject to the Federal plan except those with site-specific compliance schedules shown in table 6 of this subpart.

bAs an alternative to this schedule, the unit may close by December 19, 2000, complete retrofit while closed, and achieve final compliance upon restarting. See §§62.14108(c), 62.14108(d), and 62.14109(i) of this subpart.

cBecause final compliance is achieved in 1 year, no increments of progress are required.

dPermit issuance is issuance of a revised construction permit or revised operating permit, if a permit modification is required to retrofit controls.

eFinal compliance must be achieved no later than December 19, 2000, even if the date “1 year after permit issuance” exceeds December 19, 2000.

[63 FR 63202, Nov. 12, 1998, as amended at 65 FR 33468, May 24, 2000]