Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of March 4, 2021

Amendment


49 CFR--PART 192

View Printed Federal Register page 86 FR 2241 in PDF format.

Amendment(s) published January 11, 2021, in 86 FR 2241

Effective Dates: Mar. 12, 2021

20. Revise §192.1003 to read as follows:

§192.1003   What do the regulations in this subpart cover?

(a) General. Unless exempted in paragraph (b) of this section, this subpart prescribes minimum requirements for an IM program for any gas distribution pipeline covered under this part, including liquefied petroleum gas systems. A gas distribution operator must follow the requirements in this subpart.

(b) Exceptions. This subpart does not apply to:

(1) Individual service lines directly connected to a production line or a gathering line other than a regulated onshore gathering line as determined in §192.8;

(2) Individual service lines directly connected to either a transmission or regulated gathering pipeline and maintained in accordance with §192.740(a) and (b); and

(3) Master meter systems.

Need assistance?