e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of May 28, 2020

Amendment


49 CFR--PART 192

View Printed Federal Register page 84 FR 52244 in PDF format.

Amendment(s) published October 1, 2019, in 84 FR 52244

Effective Dates: July 1, 2020

9. Section 192.18 is added to read as follows:

§192.18   How to notify PHMSA.

(a) An operator must provide any notification required by this part by—

(1) Sending the notification by electronic mail to [email protected]; or

(2) Sending the notification by mail to ATTN: Information Resources Manager, DOT/PHMSA/OPS, East Building, 2nd Floor, E22-321, 1200 New Jersey Ave. SE, Washington, DC 20590.

(b) An operator must also notify the appropriate State or local pipeline safety authority when an applicable pipeline segment is located in a State where OPS has an interstate agent agreement, or an intrastate applicable pipeline segment is regulated by that State.

(c) Unless otherwise specified, if the notification is made pursuant to §192.506(b), §192.607(e)(4), §192.607(e)(5), §192.624(c)(2)(iii), §192.624(c)(6), §192.632(b)(3), §192.710(c)(7), §192.712(d)(3)(iv), §192.712(e)(2)(i)(E), §192.921(a)(7), or §192.937(c)(7) to use a different integrity assessment method, analytical method, sampling approach, or technique (i.e., “other technology”) that differs from that prescribed in those sections, the operator must notify PHMSA at least 90 days in advance of using the other technology. An operator may proceed to use the other technology 91 days after submittal of the notification unless it receives a letter from the Associate Administrator for Pipeline Safety informing the operator that PHMSA objects to the proposed use of other technology or that PHMSA requires additional time to conduct its review.

Need assistance?