About GPO   |   Newsroom/Media   |   Congressional Relations   |   Inspector General   |   Careers   |   Contact   |   askGPO   |   Help  
 
Home   |   Customers   |   Vendors   |   Libraries  

The Electronic Code of Federal Regulations (e-CFR) is a regularly updated, unofficial editorial compilation of CFR material and Federal Register amendments produced by the National Archives and Records Administration's Office of the Federal Register (OFR) and the Government Printing Office.

Parallel Table of Authorities and Rules for the Code of Federal Regulations and the United States Code
Text | PDF

Find, review, and submit comments on Federal rules that are open for comment and published in the Federal Register using Regulations.gov.

Purchase individual CFR titles from the U.S. Government Online Bookstore.

Find issues of the CFR (including issues prior to 1996) at a local Federal depository library.

[2]
 
 

Electronic Code of Federal Regulations

blue pill

e-CFR Data is current as of December 18, 2014

Title 40Chapter ISubchapter CPart 63


TITLE 40—Protection of Environment

CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)

SUBCHAPTER C—AIR PROGRAMS (CONTINUED)

PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)

rule

Subpart NNNNN—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: HYDROCHLORIC ACID PRODUCTION

What This Subpart Covers

§63.8980
What is the purpose of this subpart?
§63.8985
Am I subject to this subpart?
§63.8990
What parts of my plant does this subpart cover?
§63.8995
When do I have to comply with this subpart?

Emission Limitations and Work Practice Standards

§63.9000
What emission limitations and work practice standards must I meet?

General Compliance Requirements

§63.9005
What are my general requirements for complying with this subpart?

Testing and Initial Compliance Requirements

§63.9010
By what date must I conduct performance tests?
§63.9015
When must I conduct subsequent performance tests?
§63.9020
What performance tests and other procedures must I use?
§63.9025
What are my monitoring installation, operation, and maintenance requirements?
§63.9030
How do I demonstrate initial compliance with the emission limitations and work practice standards?

Continuous Compliance Requirements

§63.9035
How do I monitor and collect data to demonstrate continuous compliance?
§63.9040
How do I demonstrate continuous compliance with the emission limitations and work practice standards?

Notifications, Reports, and Records

§63.9045
What notifications must I submit and when?
§63.9050
What reports must I submit and when?
§63.9055
What records must I keep?
§63.9060
In what form and how long must I keep my records?

Other Requirements and Information

§63.9065
What parts of the General Provisions apply to me?
§63.9070
Who implements and enforces this subpart?
§63.9075
What definitions apply to this subpart?
Appendix
Table 1 to Subpart NNNNN of Part 63—Emission Limits and Work Practice Standards
Appendix
Table 2 to Subpart NNNNN of Part 63—Operating Limits
Appendix
Table 3 to Subpart NNNNN of Part 63—Performance Test Requirements for HCl Production Affected Sources
Appendix
Table 4 to Subpart NNNNN of Part 63—Initial Compliance With Emission Limitations and Work Practice Standards
Appendix
Table 5 to Subpart NNNNN of Part 63—Continuous Compliance With Emission Limitations and Work Practice Standards
Appendix
Table 6 to Subpart NNNNN of Part 63—Requirements for Reports
Appendix
Table 7 to Subpart NNNNN of Part 63—Applicability of General Provisions to Subpart NNNNN
rule

Subpart OOOOO—[RESERVED]

rule

Subpart PPPPP—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR ENGINE TEST CELLS/STANDS

What This Subpart Covers

§63.9280
What is the purpose of subpart PPPPP?
§63.9285
Am I subject to this subpart?
§63.9290
What parts of my plant does this subpart cover?
§63.9295
When do I have to comply with this subpart?

Emission Limitations

§63.9300
What emission limitations must I meet?
§63.9301
What are my options for meeting the emission limits?
§63.9302
What operating limits must I meet?

General Compliane Requirements

§63.9305
What are my general requirements for complying with this subpart?
§63.9306
What are my continuous parameter monitoring system (CPMS) installation, operation, and maintenance requirements?
§63.9307
What are my continuous emissions monitoring system installation, operation, and maintenance requirements?

Testing and Initial Compliance Requirements

§63.9310
By what date must I conduct the initial compliance demonstrations?
§63.9320
What procedures must I use?
§63.9321
What are the general requirements for performance tests?
§63.9322
How do I determine the emission capture system efficiency?
§63.9323
How do I determine the add-on control device emission destruction or removal efficiency?
§63.9324
How do I establish the emission capture system and add-on control device operating limits during the performance test?
§63.9330
How do I demonstrate initial compliance with the emission limitation?

Continuous Compliance Requirements

§63.9335
How do I monitor and collect data to demonstrate continuous compliance?
§63.9340
How do I demonstrate continuous compliance with the emission limitations?

Notifications, Reports, and Records

§63.9345
What notifications must I submit and when?
§63.9350
What reports must I submit and when?
§63.9355
What records must I keep?
§63.9360
In what form and how long must I keep my records?

Other Requirements and Information

§63.9365
What parts of the General Provisions apply to me?
§63.9370
Who implements and enforces this subpart?
§63.9375
What definitions apply to this subpart?
Appendix
Table 1 to Subpart PPPPP of Part 63—Emission Limitations
Appendix
Table 2 to Subpart PPPPP of Part 63—Operating Limits
Appendix
Table 3 to Subpart PPPPP of Part 63—Requirements for Initial Compliance Demonstrations
Appendix
Table 4 to Subpart PPPPP of Part 63—Initial Compliance With Emission Limitations
Appendix
Table 5 to Subpart PPPPP of Part 63—Continuous Compliance With Emission Limitations
Appendix
Table 6 to Subpart PPPPP of Part 63—Requirements for Reports
Appendix
Table 7 to Subpart PPPPP of Part 63—Applicability of General Provisions to Subpart PPPPP
rule

Subpart QQQQQ—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR FRICTION MATERIALS MANUFACTURING FACILITIES

What This Subpart Covers

§63.9480
What is the purpose of this subpart?
§63.9485
Am I subject to this subpart?
§63.9490
What parts of my plant does this subpart cover?
§63.9495
When do I have to comply with this subpart?

Emission Limitations

§63.9500
What emission limitations must I meet?

General Compliance Requirements

§63.9505
What are my general requirements for complying with this subpart?

Initial Compliance Demonstration Requirements

§63.9510
By what date must I conduct my initial compliance demonstration?
§63.9515
How do I demonstrate initial compliance with the emission limitation that applies to me?
§63.9520
What procedures must I use to demonstrate initial compliance?
§63.9525
What are the installation, operation, and maintenance requirements for my weight measurement device?

Continuous Compliance Requirements

§63.9530
How do I demonstrate continuous compliance with the emission limitation that applies to me?

Notifications, Reports, and Records

§63.9535
What notifications must I submit and when?
§63.9540
What reports must I submit and when?
§63.9545
What records must I keep?
§63.9550
In what form and how long must I keep my records?

Other Requirements and Information

§63.9555
What parts of the General Provisions apply to me?
§63.9560
Who implements and enforces this subpart?
§63.9565
What definitions apply to this subpart?
§63.9570
How do I apply for alternative compliance requirements?
§§63.9571-63.9579
[Reserved]
Appendix
Table 1 to Subpart QQQQQ of Part 63—Applicability of General Provisions to Subpart QQQQQ
rule

Subpart RRRRR—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: TACONITE IRON ORE PROCESSING

What This Subpart Covers

§63.9580
What is the purpose of this subpart?
§63.9581
Am I subject to this subpart?
§63.9582
What parts of my plant does this subpart cover?
§63.9583
When do I have to comply with this subpart?

Emission Limitations and Work Practice Standards

§63.9590
What emission limitations must I meet?
§63.9591
What work practice standards must I meet?

Operation and Maintenance Requirements

§63.9600
What are my operation and maintenance requirements?

General Compliance Requirements

§63.9610
What are my general requirements for complying with this subpart?

Initial Compliance Requirements

§63.9620
On which units and by what date must I conduct performance tests or other initial compliance demonstrations?
§63.9621
What test methods and other procedures must I use to demonstrate initial compliance with the emission limits for particulate matter?
§63.9622
What test methods and other procedures must I use to establish and demonstrate initial compliance with the operating limits?
§63.9623
How do I demonstrate initial compliance with the emission limitations that apply to me?
§63.9624
How do I demonstrate initial compliance with the work practice standards that apply to me?
§63.9625
How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?

Continuous Compliance Requirements

§63.9630
When must I conduct subsequent performance tests?
§63.9631
What are my monitoring requirements?
§63.9632
What are the installation, operation, and maintenance requirements for my monitoring equipment?
§63.9633
How do I monitor and collect data to demonstrate continuous compliance?
§63.9634
How do I demonstrate continuous compliance with the emission limitations that apply to me?
§63.9635
How do I demonstrate continuous compliance with the work practice standards that apply to me?
§63.9636
How do I demonstrate continuous compliance with the operation and maintenance requirements that apply to me?
§63.9637
What other requirements must I meet to demonstrate continuous compliance?

Notifications, Reports, and Records

§63.9640
What notifications must I submit and when?
§63.9641
What reports must I submit and when?
§63.9642
What records must I keep?
§63.9643
In what form and how long must I keep my records?

Other Requirements and Information

§63.9650
What parts of the General Provisions apply to me?
§63.9651
Who implements and enforces this subpart?
§63.9652
What definitions apply to this subpart?
Appendix
Table 1 to Subpart RRRRR of Part 63—Emission Limits
Appendix
Table 2 to Subpart RRRRR of Part 63—Applicability of General Provisions to Subpart RRRRR of Part 63
rule

Subpart SSSSS—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR REFRACTORY PRODUCTS MANUFACTURING

What This Subpart Covers

§63.9780
What is the purpose of this subpart?
§63.9782
Am I subject to this subpart?
§63.9784
What parts of my plant does this subpart cover?
§63.9786
When do I have to comply with this subpart?

Emission Limitations and Work Practice Standards

§63.9788
What emission limits, operating limits, and work practice standards must I meet?
§63.9790
What are my options for meeting the emission limits?

General Compliance Requirements

§63.9792
What are my general requirements for complying with this subpart?
§63.9794
What do I need to know about operation, maintenance, and monitoring plans?

Testing and Initial Compliance Requirements

§63.9796
By what date must I conduct performance tests?
§63.9798
When must I conduct subsequent performance tests?
§63.9800
How do I conduct performance tests and establish operating limits?
§63.9802
How do I develop an emissions profile?
§63.9804
What are my monitoring system installation, operation, and maintenance requirements?
§63.9806
How do I demonstrate initial compliance with the emission limits, operating limits, and work practice standards?

Continuous Compliance Requirements

§63.9808
How do I monitor and collect data to demonstrate continuous compliance?
§63.9810
How do I demonstrate continuous compliance with the emission limits, operating limits, and work practice standards?

Notifications, Reports, and Records

§63.9812
What notifications must I submit and when?
§63.9814
What reports must I submit and when?
§63.9816
What records must I keep?
§63.9818
In what form and how long must I keep my records?

Other Requirements and Information

§63.9820
What parts of the General Provisions apply to me?
§63.9822
Who implements and enforces this subpart?
§63.9824
What definitions apply to this subpart?
Appendix
Table 1 to Subpart SSSSS of Part 63—Emission Limits
Appendix
Table 2 to Subpart SSSSS of Part 63—Operating Limits
Appendix
Table 3 to Subpart SSSSS of Part 63—Work Practice Standards
Appendix
Table 4 to Subpart SSSSS to Part 63—Requirements for Performance Tests
Appendix
Table 5 to Subpart SSSSS of Part 63—Initial Compliance With Emission Limits
Appendix
Table 6 to Subpart SSSSS of Part 63—Initial Compliance With Work Practice Standards
Appendix
Table 7 to Subpart SSSSS of Part 63—Continuous Compliance with Emission Limits
Appendix
Table 8 to Subpart SSSSS of Part 63—Continuous Compliance with Operating Limits
Appendix
Table 9 to Subpart SSSSS of Part 63—Continuous Compliance With Work Practice Standards
Appendix
Table 10 to Subpart SSSSS of Part 63—Requirements for Reports
Appendix
Table 11 to Subpart SSSSS of Part 63—Applicability of General Provisions to Subpart SSSSS
rule

Subpart TTTTT—NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR PRIMARY MAGNESIUM REFINING

What This Subpart Covers

§63.9880
What is the purpose of this subpart?
§63.9881
Am I subject to this subpart?
§63.9882
What parts of my plant does this subpart cover?
§63.9883
When do I have to comply with this subpart?

Emission Limitations and Work Practice Standards

§63.9890
What emission limitations must I meet?
§63.9891
What work practice standards must I meet for my fugitive dust sources?

Operation and Maintenance Requirements

§63.9900
What are my operation and maintenance requirements?

General Compliance Requirements

§63.9910
What are my general requirements for complying with this subpart?

Initial Compliance Requirements

§63.9911
By what date must I conduct performance tests or other initial compliance demonstrations?
§63.9912
When must I conduct subsequent performance tests?
§63.9913
What test methods and other procedures must I use to demonstrate initial compliance with the emission limits for particulate matter and PM10?
§63.9914
What test methods and other procedures must I use to demonstrate initial compliance with chlorine and hydrochloric acid emission limits?
§63.9915
What test methods and other procedures must I use to demonstrate initial compliance with dioxin/furan emission limits?
§63.9916
What test methods and other procedures must I use to establish and demonstrate initial compliance with the operating limits?
§63.9917
How do I demonstrate initial compliance with the emission limitations and work practice standards that apply to me?
§63.9918
How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?

Continuous Compliance Requirements

§63.9920
What are my continuous monitoring requirements?
§63.9921
What are the installation, operation and maintenance requirements for my monitors?
§63.9922
How do I monitor and collect data to demonstrate continuous compliance?
§63.9923
How do I demonstrate continuous compliance with the emission limitations and work practice standards that apply to me?
§63.9924
How do I demonstrate continuous compliance with the operation and maintenance requirements that apply to me?
§63.9925
What other requirements must I meet to demonstrate continuous compliance?

Notifications, Reports, and Records

§63.9930
What notifications must I submit and when?
§63.9931
What reports must I submit and when?
§63.9932
What records must I keep?
§63.9933
In what form and how long must I keep my records?

Other Requirements and Information

§63.9940
What parts of the General Provisions apply to me?
§63.9941
Who implements and enforces this subpart?
§63.9942
What definitions apply to this subpart?
Appendix
Table 1 to Subpart TTTTT of Part 63—Emission Limits
Appendix
Table 2 to Subpart TTTTT of Part 63—Toxic Equivalency Factors
Appendix
Table 3 to Subpart TTTTT of Part 63—Initial Compliance With Emission Limits
Appendix
Table 4 to Subpart TTTTT of Part 63—Continuous Compliance With Emission Limits
Appendix
Table 5 to Subpart TTTTT of Part 63—Applicability of General Provisions to Subpart TTTTT of Part 63
rule

Subpart UUUUU—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: COAL- AND OIL-FIRED ELECTRIC UTILITY STEAM GENERATING UNITS

What This Subpart Covers

§63.9980
What is the purpose of this subpart?
§63.9981
Am I subject to this subpart?
§63.9982
What is the affected source of this subpart?
§63.9983
Are any EGUs not subject to this subpart?
§63.9984
When do I have to comply with this subpart?
§63.9985
What is a new EGU?

Emission Limitations and Work Practice Standards

§63.9990
What are the subcategories of EGUs?
§63.9991
What emission limitations, work practice standards, and operating limits must I meet?

General Compliance Requirements

§63.10000
What are my general requirements for complying with this subpart?
§63.10001
Affirmative defense for exceedence of emission limit during malfunction.

Testing and Initial Compliance Requirements

§63.10005
What are my initial compliance requirements and by what date must I conduct them?
§63.10006
When must I conduct subsequent performance tests or tune-ups?
§63.10007
What methods and other procedures must I use for the performance tests?
§63.10008
[Reserved]
§63.10009
May I use emissions averaging to comply with this subpart?
§63.10010
What are my monitoring, installation, operation, and maintenance requirements?
§63.10011
How do I demonstrate initial compliance with the emissions limits and work practice standards?

Continuous Compliance Requirements

§63.10020
How do I monitor and collect data to demonstrate continuous compliance?
§63.10021
How do I demonstrate continuous compliance with the emission limitations, operating limits, and work practice standards?
§63.10022
How do I demonstrate continuous compliance under the emissions averaging provision?
§63.10023
How do I establish my PM CPMS operating limit and determine compliance with it?

Notification, Reports, and Records

§63.10030
What notifications must I submit and when?
§63.10031
What reports must I submit and when?
§63.10032
What records must I keep?
§63.10033
In what form and how long must I keep my records?

Other Requirements and Information

§63.10040
What parts of the General Provisions apply to me?
§63.10041
Who implements and enforces this subpart?
§63.10042
What definitions apply to this subpart?
Appendix
Table 1 to Subpart UUUUU of Part 63—Emission Limits for New or Reconstructed EGUs
Appendix
Table 2 to Subpart UUUUU of Part 63—Emission Limits for Existing EGUs
Appendix
Table 3 to Subpart UUUUU of Part 63—Work Practice Standards
Appendix
Table 4 to Subpart UUUUU of Part 63—Operating Limits for EGUs
Appendix
Table 5 to Subpart UUUUU of Part 63—Performance Testing Requirements
Appendix
Table 6 to Subpart UUUUU of Part 63—Establishing PM CPMS Operating Limits
Appendix
Table 7 to Subpart UUUUU of Part 63—Demonstrating Continuous Compliance
Appendix
Table 8 to Subpart UUUUU of Part 63—Reporting Requirements
Appendix
Table 9 to Subpart UUUUU of Part 63—Applicability of General Provisions to Subpart UUUUU
Appendix
Appendix A to Subpart UUUUU of Part 63—Hg Monitoring Provisions
Appendix
Appendix B to Subpart UUUUU of Part 63—-HCl and HF Monitoring Provisions
rule

Subpart VVVVV—[RESERVED]

rule

Subpart WWWWW—NATIONAL EMISSION STANDARDS FOR HOSPITAL ETHYLENE OXIDE STERILIZERS

Applicability and Compliance Dates

§63.10382
Am I subject to this subpart?
§63.10384
What are my compliance dates?

Standards

§63.10390
What management practice standard must I meet?

Initial Compliance Requirements

§63.10400
How do I demonstrate initial compliance?
§63.10402
By what date must I demonstrate initial compliance?

Monitoring—Continuous Compliance Requirements

§63.10420
How do I demonstrate continuous compliance with the management practice requirements?

Notifications, Reports, and Records

§63.10430
What notifications must I submit and by when?
§63.10432
What records must I keep?
§63.10434
In what form and for how long must I keep my records?

Other Requirements and Information

§63.10440
What parts of the General Provisions apply to me?
§63.10442
Who implements and enforces this subpart?
§63.10446
Do title V permitting requirements apply to area sources subject to this subpart?
§63.10448
What definitions apply to this subpart?
Appendix
Table 1 to Subpart WWWWW of Part 63—Applicability of General Provisions to Subpart WWWWW
rule

Subpart XXXXX—[RESERVED]

rule

Subpart YYYYY—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR AREA SOURCES: ELECTRIC ARC FURNACE STEELMAKING FACILITIES

Applicability and Compliance Dates

§63.10680
Am I subject to this subpart?
§63.10681
What are my compliance dates?

Standards and Compliance Requirements

§63.10685
What are the requirements for the control of contaminants from scrap?
§63.10686
What are the requirements for electric arc furnaces and argon-oxygen decarburization vessels?

Other Information and Requirements

§63.10690
What parts of the General Provisions apply to this subpart?
§63.10691
Who implements and enforces this subpart?
§63.10692
What definitions apply to this subpart?
Appendix
Table 1 to Subpart YYYYY of Part 63—Applicability of General Provisions to Subpart YYYYY
rule

Subpart ZZZZZ—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR IRON AND STEEL FOUNDRIES AREA SOURCES

Applicability and Compliance Dates

§63.10880
Am I subject to this subpart?
§63.10881
What are my compliance dates?

Pollution Prevention Management Practices for New and Existing Affected Sources

§63.10885
What are my management practices for metallic scrap and mercury switches?
§63.10886
What are my management practices for binder formulations?

Requirements for New and Existing Affected Sources Classified as Small Foundries

§63.10890
What are my management practices and compliance requirements?

Requirements for New and Existing Affected Sources Classified as Large Iron and Steel Foundries

§63.10895
What are my standards and management practices?
§63.10896
What are my operation and maintenance requirements?
§63.10897
What are my monitoring requirements?
§63.10898
What are my performance test requirements?
§63.10899
What are my recordkeeping and reporting requirements?
§63.10900
What parts of the General Provisions apply to my large foundry?

Other Requirements and Information

§63.10905
Who implements and enforces this subpart?
§63.10906
What definitions apply to this subpart?
Appendix
Table 1 to Subpart ZZZZZ of Part 63—Performance Test Requirements for New and Existing Affected Sources Classified as Large Foundries
Appendix
Table 2 to Subpart ZZZZZ of Part 63—Procedures for Establishing Operating Limits for New Affected Sources Classified as Large Foundries
Appendix
Table 3 to Subpart ZZZZZ of Part 63—Applicability of General Provisions to New and Existing Affected Sources Classified as Large Foundries
Appendix
Table 4 to Subpart ZZZZZ of Part 63—Compliance Certifications for New and Existing Affected Sources Classified as Large Iron and Steel Foundries
rule

Subpart AAAAAA—[RESERVED]

rule

Subpart BBBBBB—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORY: GASOLINE DISTRIBUTION BULK TERMINALS, BULK PLANTS, AND PIPELINE FACILITIES

What This Subpart Covers

§63.11080
What is the purpose of this subpart?
§63.11081
Am I subject to the requirements in this subpart?
§63.11082
What parts of my affected source does this subpart cover?
§63.11083
When do I have to comply with this subpart?

Emission Limitations and Management Practices

§63.11085
What are my general duties to minimize emissions?
§63.11086
What requirements must I meet if my facility is a bulk gasoline plant?
§63.11087
What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?
§63.11088
What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline pumping station?
§63.11089
What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline pumping station?

Testing and Monitoring Requirements

§63.11092
What testing and monitoring requirements must I meet?

Notifications, Records, and Reports

§63.11093
What notifications must I submit and when?
§63.11094
What are my recordkeeping requirements?
§63.11095
What are my reporting requirements?

Other Requirements and Information

§63.11098
What parts of the General Provisions apply to me?
§63.11099
Who implements and enforces this subpart?
§63.11100
What definitions apply to this subpart?
Appendix
Table 1 to Subpart BBBBBB of Part 63—Applicability Criteria, Emission Limits, and Management Practices for Storage Tanks
Appendix
Table 2 to Subpart BBBBBB of Part 63—Applicability Criteria, Emission Limits, and Management Practices for Loading Racks
Appendix
Table 3 to Subpart BBBBBB of Part 63—Applicability of General Provisions
rule

Subpart CCCCCC—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORY: GASOLINE DISPENSING FACILITIES

What This Subpart Covers

§63.11110
What is the purpose of this subpart?
§63.11111
Am I subject to the requirements in this subpart?
§63.11112
What parts of my affected source does this subpart cover?
§63.11113
When do I have to comply with this subpart?

Emission Limitations and Management Practices

§63.11115
What are my general duties to minimize emissions?
§63.11116
Requirements for facilities with monthly throughput of less than 10,000 gallons of gasoline.
§63.11117
Requirements for facilities with monthly throughput of 10,000 gallons of gasoline or more.
§63.11118
Requirements for facilities with monthly throughput of 100,000 gallons of gasoline or more.

Testing and Monitoring Requirements

§63.11120
What testing and monitoring requirements must I meet?

Notifications, Records, and Reports

§63.11124
What notifications must I submit and when?
§63.11125
What are my recordkeeping requirements?
§63.11126
What are my reporting requirements?

Other Requirements and Information

§63.11130
What parts of the General Provisions apply to me?
§63.11131
Who implements and enforces this subpart?
§63.11132
What definitions apply to this subpart?
Appendix
Table 1 to Subpart CCCCCC of Part 63—Applicability Criteria and Management Practices for Gasoline Dispensing Facilities With Monthly Throughput of 100,000 Gallons of Gasoline or More
Appendix
Table 2 to Subpart CCCCCC of Part 63—Applicability Criteria and Management Practices for Gasoline Cargo Tanks Unloading at Gasoline Dispensing Facilities With Monthly Throughput of 100,000 Gallons of Gasoline or More
Appendix
Table 3 to Subpart CCCCCC of Part 63—Applicability of General Provisions
rule

Subpart DDDDDD—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR POLYVINYL CHLORIDE AND COPOLYMERS PRODUCTION AREA SOURCES

Applicability and Compliance Dates

§63.11140
Am I subject to this subpart?
§63.11141
What are my compliance dates?

Standards and Compliance Requirements

§63.11142
What are the standards and compliance requirements for new and existing sources?

Other Requirements and Information

§63.11143
What General Provisions apply to this subpart?
§63.11144
What definitions apply to this subpart?
§63.11145
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart DDDDDD of Part 63—Emission Limits and Standards for Existing Affected Sources
Appendix
Table 2 to Subpart DDDDDD of Part 63—Emission Limits and Standards for New Affected Sources
rule

Subpart EEEEEE—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR PRIMARY COPPER SMELTING AREA SOURCES

Applicability and Compliance Dates

§63.11146
What are the applicability provisions and compliance dates?

Standards and Compliance Requirements

§63.11147
What are the standards and compliance requirements for existing sources not using batch copper converters?
§63.11148
What are the standards and compliance requirements for existing sources using batch copper converters?
§63.11149
What are the standards and compliance requirements for new sources?

Other Requirements and Information

§63.11150
What General Provisions apply to this subpart?
§63.11151
What definitions apply to this subpart?
§63.11152
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart EEEEEE of Part 63—Applicability of General Provisions to Subpart EEEEEE
rule

Subpart FFFFFF—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SECONDARY COPPER SMELTING AREA SOURCES

Applicability and Compliance Dates

§63.11153
Am I subject to this subpart?
§63.11154
What are my compliance dates?

Standards and Compliance Requirements

§63.11155
What are the standards and compliance requirements for new sources?
§63.11156
[Reserved]

Other Requirements and Information

§63.11157
What General Provisions apply to this subpart?
§63.11158
What definitions apply to this subpart?
§63.11159
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart FFFFFF of Part 63—Applicability of General Provisions to Subpart FFFFFF
rule

Subpart GGGGGG—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR PRIMARY NONFERROUS METALS AREA SOURCES—ZINC, CADMIUM, AND BERYLLIUM

Applicability and Compliance Dates

§63.11160
Am I subject to this subpart?
§63.11161
What are my compliance dates?

Primary Zinc Production Facilities

§63.11162
What are the standards and compliance requirements for existing sources?
§63.11163
What are the standards and compliance requirements for new sources?
§63.11164
What General Provisions apply to primary zinc production facilities?

Primary Beryllium Production Facilities

§63.11165
What are the standards and compliance requirements for new and existing sources?
§63.11166
What General Provisions apply to primary beryllium production facilities?

Other Requirements and Information

§63.11167
What definitions apply to this subpart?
§63.11168
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart GGGGGG of Part 63—Applicability of General Provisions to Primary Zinc Production Area Sources
rule

Subpart HHHHHH—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: PAINT STRIPPING AND MISCELLANEOUS SURFACE COATING OPERATIONS AT AREA SOURCES

What This Subpart Covers

§63.11169
What is the purpose of this subpart?
§63.11170
Am I subject to this subpart?
§63.11171
How do I know if my source is considered a new source or an existing source?

General Compliance Requirements

§63.11172
When do I have to comply with this subpart?
§63.11173
What are my general requirements for complying with this subpart?
§63.11174
What parts of the General Provisions apply to me?

Notifications, Reports, and Records

§63.11175
What notifications must I submit?
§63.11176
What reports must I submit?
§63.11177
What records must I keep?
§63.11178
In what form and for how long must I keep my records?

Other Requirements and Information

§63.11179
Who implements and enforces this subpart?
§63.11180
What definitions do I need to know?
Appendix
Table 1 to Subpart HHHHHH of Part 63—Applicability of General Provisions to Subpart HHHHHH of Part 63
rule

Subpart IIIIII—[RESERVED]

rule

Subpart JJJJJJ—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AREA SOURCES

What This Subpart Covers

§63.11193
Am I subject to this subpart?
§63.11194
What is the affected source of this subpart?
§63.11195
Are any boilers not subject to this subpart?
§63.11196
What are my compliance dates?

Emission Limits, Work Practice Standards, Emission Reduction Measures, and Management Practices

§63.11200
What are the subcategories of boilers?
§63.11201
What standards must I meet?

General Compliance Requirements

§63.11205
What are my general requirements for complying with this subpart?

Initial Compliance Requirements

§63.11210
What are my initial compliance requirements and by what date must I conduct them?
§63.11211
How do I demonstrate initial compliance with the emission limits?
§63.11212
What stack tests and procedures must I use for the performance tests?
§63.11213
What fuel analyses and procedures must I use for the performance tests?
§63.11214
How do I demonstrate initial compliance with the work practice standard, emission reduction measures, and management practice?

Continuous Compliance Requirements

§63.11220
When must I conduct subsequent performance tests or fuel analyses?
§63.11221
Is there a minimum amount of monitoring data I must obtain?
§63.11222
How do I demonstrate continuous compliance with the emission limits?
§63.11223
How do I demonstrate continuous compliance with the work practice and management practice standards?
§63.11224
What are my monitoring, installation, operation, and maintenance requirements?
§63.11225
What are my notification, reporting, and recordkeeping requirements?
§63.11226
Affirmative defense for violation of emission standards during malfunction.

Other Requirements and Information

§63.11235
What parts of the General Provisions apply to me?
§63.11236
Who implements and enforces this subpart?
§63.11237
What definitions apply to this subpart?
Appendix
Table 1 to Subpart JJJJJJ of Part 63—Emission Limits
Appendix
Table 2 to Subpart JJJJJJ of Part 63—Work Practice Standards, Emission Reduction Measures, and Management Practices
Appendix
Table 3 to Subpart JJJJJJ of Part 63—Operating Limits for Boilers With Emission Limits
Appendix
Table 4 to Subpart JJJJJJ of Part 63—Performance (Stack) Testing Requirements
Appendix
Table 5 to Subpart JJJJJJ of Part 63—Fuel Analysis Requirements
Appendix
Table 6 to Subpart JJJJJJ of Part 63—Establishing Operating Limits
Appendix
Table 7 to Subpart JJJJJJ of Part 63—Demonstrating Continuous Compliance
Appendix
Table 8 to Subpart JJJJJJ of Part 63—Applicability of General Provisions to Subpart JJJJJJ
rule

Subpart KKKKKK—[RESERVED]

rule

Subpart LLLLLL—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR ACRYLIC AND MODACRYLIC FIBERS PRODUCTION AREA SOURCES

Applicability and Compliance Dates

§63.11393
Am I subject to this subpart?
§63.11394
What are my compliance dates?

Standards and Compliance Requirements

§63.11395
What are the standards and compliance requirements for existing sources?
§63.11396
What are the standards and compliance requirements for new sources?

Other Requirements and Information

§63.11397
What General Provisions apply to this subpart?
§63.11398
What definitions apply to this subpart?
§63.11399
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart LLLLLL of Part 63—Applicability of General Provisions to Subpart LLLLLL
rule

Subpart MMMMMM—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR CARBON BLACK PRODUCTION AREA SOURCES

Applicability and Compliance Dates

§63.11400
Am I subject to this subpart?
§63.11401
What are my compliance dates?

Standards and Compliance Requirements

§63.11402
What are the standards and compliance requirements for new and existing sources?
§63.11403
[Reserved]

Other Requirements and Information

§63.11404
What General Provisions apply to this subpart?
§63.11405
What definitions apply to this subpart?
§63.11406
Who implements and enforces this subpart?
rule

Subpart NNNNNN—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR CHEMICAL MANUFACTURING AREA SOURCES: CHROMIUM COMPOUNDS

Applicability and Compliance Dates

§63.11407
Am I subject to this subpart?
§63.11408
What are my compliance dates?

Standards and Compliance Requirements

§63.11409
What are the standards?
§63.11410
What are the compliance requirements?

Other Requirements and Information

§63.11411
What General Provisions apply to this subpart?
§63.11412
What definitions apply to this subpart?
§63.11413
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart NNNNNN of Part 63—HAP Emissions Sources
Appendix
Table 2 to Subpart NNNNNN of Part 63—Applicability of General Provisions to Subpart NNNNNN
rule

Subpart OOOOOO—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR FLEXIBLE POLYURETHANE FOAM PRODUCTION AND FABRICATION AREA SOURCES

Applicability and Compliance Dates

§63.11414
Am I subject to this subpart?
§63.11415
What are my compliance dates?

Standards and Compliance Requirements

§63.11416
What are the standards for new and existing sources?
§63.11417
What are the compliance requirements for new and existing sources?

Other Requirements and Information

§63.11418
What General Provisions apply to this subpart?
§63.11419
What definitions apply to this subpart?
§63.11420
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart OOOOOO of Part 63—Applicability of General Provisions to Subpart OOOOOO
rule

Subpart PPPPPP—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR LEAD ACID BATTERY MANUFACTURING AREA SOURCES

Applicability and Compliance Dates

§63.11421
Am I subject to this subpart?
§63.11422
What are my compliance dates?

Standards and Compliance Requirements

§63.11423
What are the standards and compliance requirements for new and existing sources?
§63.11424
[Reserved]

Other Requirements and Information

§63.11425
What General Provisions apply to this subpart?
§63.11426
What definitions apply to this subpart?
§63.11427
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart PPPPPP of Part 63—Applicability of General Provisions to Subpart PPPPPP
rule

Subpart QQQQQQ—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR WOOD PRESERVING AREA SOURCES

Applicability and Compliance Dates

§63.11428
Am I subject to this subpart?
§63.11429
What are my compliance dates?

Standards

§63.11430
What are the standards?
§63.11431
[Reserved]

Other Requirements and Information

§63.11432
What General Provisions apply to this subpart?
§63.11433
What definitions apply to this subpart?
§63.11434
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart QQQQQQ of Part 63—Applicability of General Provisions to Subpart QQQQQQ
rule

Subpart RRRRRR—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR CLAY CERAMICS MANUFACTURING AREA SOURCES

Applicability and Compliance Dates

§63.11435
Am I subject to this subpart?
§63.11436
What parts of my plant does this subpart cover?
§63.11437
What are my compliance dates?

Standards, Compliance, and Monitoring Requirements

§63.11438
What are the standards for new and existing sources?
§63.11439
What are the initial compliance demonstration requirements for new and existing sources?
§63.11440
What are the monitoring requirements for new and existing sources?
§63.11441
What are the notification requirements?
§63.11442
What are the recordkeeping requirements?

Other Requirements and Information

§63.11443
What General Provisions apply to this subpart?
§63.11444
What definitions apply to this subpart?
§63.11445
Who implements and enforces this subpart?
§§63.11446-63.11447
[Reserved]
Appendix
Table 1 to Subpart RRRRRR of Part 63—Applicability of General Provisions to Subpart RRRRRR
rule

Subpart SSSSSS—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR GLASS MANUFACTURING AREA SOURCES

Applicability and Compliance Dates

§63.11448
Am I subject to this subpart?
§63.11449
What parts of my plant does this subpart cover?
§63.11450
What are my compliance dates?

Standards, Compliance, and Monitoring Requirements

§63.11451
What are the standards for new and existing sources?
§63.11452
What are the performance test requirements for new and existing sources?
§63.11453
What are the initial compliance demonstration requirements for new and existing sources?
§63.11454
What are the monitoring requirements for new and existing sources?
§63.11455
What are the continuous compliance requirements for new and existing sources?

Notifications and Records

§63.11456
What are the notification requirements?
§63.11457
What are the recordkeeping requirements?

Other Requirements and Information

§63.11458
What General Provisions apply to this subpart?
§63.11459
What definitions apply to this subpart?
§63.11460
Who implements and enforces this subpart?
§63.11461
[Reserved]
Appendix
Table 1 to Subpart SSSSSS of Part 63—Emission Limits
Appendix
Table 2 to Subpart SSSSSS of Part 63—Applicability of General Provisions to Subpart SSSSSS
rule

Subpart TTTTTT—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SECONDARY NONFERROUS METALS PROCESSING AREA SOURCES

Applicability and Compliance Dates

§63.11462
Am I subject to this subpart?
§63.11463
What parts of my plant does this subpart cover?
§63.11464
What are my compliance dates?

Standards, Compliance, and Monitoring Requirements

§63.11465
What are the standards for new and existing sources?
§63.11466
What are the performance test requirements for new and existing sources?
§63.11467
What are the initial compliance demonstration requirements for new and existing sources?
§63.11468
What are the monitoring requirements for new and existing sources?
§63.11469
What are the notification requirements?
§63.11470
What are the recordkeeping requirements?

Other Requirements and Information

§63.11471
What General Provisions apply to this subpart?
§63.11472
What definitions apply to this subpart?
§63.11473
Who implements and enforces this subpart?
§63.11474
[Reserved]
Appendix
Table 1 to Subpart TTTTTT of Part 63—Applicability of General Provisions to Subpart TTTTTT
rule

Subpart UUUUUU—[RESERVED]

rule

Subpart VVVVVV—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR CHEMICAL MANUFACTURING AREA SOURCES

Applicability and Compliance Dates

§63.11494
What are the applicability requirements and compliance dates?

Standards and Compliance Requirements

§63.11495
What are the management practices and other requirements?
§63.11496
What are the standards and compliance requirements for process vents?
§63.11497
What are the standards and compliance requirements for storage tanks?
§63.11498
What are the standards and compliance requirements for wastewater systems?
§63.11499
What are the standards and compliance requirements for heat exchange systems?
§63.11500
What compliance options do I have if part of my plant is subject to both this subpart and another Federal standard?
§63.11501
What are the notification, recordkeeping, and reporting requirements, and how may I assert an affirmative defense for violation of emission standards during malfunction?

Other Requirements and Information

§63.11502
What definitions apply to this subpart?
§63.11503
Who implements and enforces this subpart?
Appendix
Table 1 to Subpart VVVVVV of Part 63—Hazardous Air Pollutants Used To Determine Applicability of Chemical Manufacturing Operations
Appendix
Table 2 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Batch Process Vents
Appendix
Table 3 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Continuous Process Vents
Appendix
Table 4 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Metal HAP Process Vents
Appendix
Table 5 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Storage Tanks
Appendix
Table 6 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Wastewater Systems
Appendix
Table 7 to Subpart VVVVVV of Part 63—Partially Soluble HAP
Appendix
Table 8 to Subpart VVVVVV of Part 63—Emission Limits and Compliance Requirements for Heat Exchange Systems
Appendix
Table 9 to Subpart VVVVVV of Part 63—Applicability of General Provisions to Subpart VVVVVV
rule

Subpart WWWWWW—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: AREA SOURCE STANDARDS FOR PLATING AND POLISHING OPERATIONS

Applicability and Compliance Dates

§63.11504
Am I subject to this subpart?
§63.11505
What parts of my plant does this subpart cover?
§63.11506
What are my compliance dates?

Standards and Compliance Requirements

§63.11507
What are my standards and management practices?
§63.11508
What are my compliance requirements?
§63.11509
What are my notification, reporting, and recordkeeping requirements?

Other Requirements and Information

§63.11510
What General Provisions apply to this subpart?
§63.11511
What definitions apply to this subpart?
§63.11512
Who implements and enforces this subpart?
§63.11513
[Reserved]
Appendix
Table 1 to Subpart WWWWWW of Part 63—Applicability of General Provisions to Plating and Polishing Area Sources
rule

Subpart XXXXXX—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS AREA SOURCE STANDARDS FOR NINE METAL FABRICATION AND FINISHING SOURCE CATEGORIES

Applicability and Compliance Dates

§63.11514
Am I subject to this subpart?
§63.11515
What are my compliance dates?

Standards and Compliance Requirements

§63.11516
What are my standards and management practices?
§63.11517
What are my monitoring requirements?
§63.11518
[Reserved]
§63.11519
What are my notification, recordkeeping, and reporting requirements?
§63.11520
[Reserved]

Other Requirements and Information

§63.11521
Who implements and enforces this subpart?
§63.11522
What definitions apply to this subpart?
§63.11523
What General Provisions apply to this subpart?
Appendix
Table 1 to Subpart XXXXXX of Part 63—Description of Source Categories Affected by This Subpart
Appendix
Table 2 to Subpart XXXXXX of Part 63—Applicability of General Provisions to Metal Fabrication or Finishing Area Sources
rule

Subpart YYYYYY—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR AREA SOURCES: FERROALLOYS PRODUCTION FACILITIES

Applicability and Compliance Dates

§63.11524
Am I subject to this subpart?
§63.11525
What are my compliance dates?

Standards, Monitoring, and Compliance Requirements

§63.11526
What are the standards for new and existing ferroalloys production facilities?
§63.11527
What are the monitoring requirements for new and existing sources?
§63.11528
What are the performance test and compliance requirements for new and existing sources?
§63.11529
What are the notification, reporting, and recordkeeping requirements?

Other Requirements and Information

§63.11530
What parts of the General Provisions apply to my facility?
§63.11531
Who implements and enforces this subpart?
§63.11532
What definitions apply to this subpart?
§§63.11533-63.11543
[Reserved]
Appendix
Table 1 to Subpart YYYYYY of Part 63—Applicability of General Provisions
rule

Subpart ZZZZZZ—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: AREA SOURCE STANDARDS FOR ALUMINUM, COPPER, AND OTHER NONFERROUS FOUNDRIES

Applicability and Compliance Dates

§63.11544
Am I subject to this subpart?
§63.11545
What are my compliance dates?

Standards and Compliance Requirements

§63.11550
What are my standards and management practices?
§63.11551
What are my initial compliance requirements?
§63.11552
What are my monitoring requirements?
§63.11553
What are my notification, reporting, and recordkeeping requirements?

Other Requirements and Information

§63.11555
What General Provisions apply to this subpart?
§63.11556
What definitions apply to this subpart?
§63.11557
Who implements and enforces this subpart?
§63.11558
[Reserved]
Appendix
Table 1 to Subpart ZZZZZZ of Part 63—Applicability of General Provisions to Aluminum, Copper, and Other Nonferrous Foundries Area Sources
rule

Subpart AAAAAAA—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR AREA SOURCES: ASPHALT PROCESSING AND ASPHALT ROOFING MANUFACTURING

Applicability and Compliance Dates

§63.11559
Am I subject to this subpart?
§63.11560
What are my compliance dates?

Standards and Compliance Requirements

§63.11561
What are my standards and management practices?
§63.11562
What are my initial compliance requirements?
§63.11563
What are my monitoring requirements?
§63.11564
What are my notification, recordkeeping, and reporting requirements?

Other Requirements and Information

§63.11565
What general provisions sections apply to this subpart?
§63.11566
What definitions apply to this subpart?
§63.11567
Who implements and enforces this subpart?
Appendix
Table 1 of Subpart AAAAAAA of Part 63—Emission Limits for Asphalt Processing (Refining) Operations
Appendix
Table 2 of Subpart AAAAAAA of Part 63—Emission Limits for Asphalt Roofing Manufacturing (Coating) Operations
Appendix
Table 3 of Subpart AAAAAAA of Part 63—Test Methods
Appendix
Table 4 of Subpart AAAAAAA of Part 63—Operating Limits
Appendix
Table 5 of Subpart AAAAAAA of Part 63—Applicability of General Provisions to Subpart AAAAAAA
rule

Subpart BBBBBBB—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR AREA SOURCES: CHEMICAL PREPARATIONS INDUSTRY

Applicability and Compliance Dates

§63.11579
Am I subject to this subpart?
§63.11580
What are my compliance dates?

Standards and Compliance Requirements

§63.11581
What are my standards?
§63.11582
What are my compliance requirements?
§63.11583
What are my monitoring requirements?
§63.11584
What are my initial and continuous compliance management practice requirements?
§63.11585
What are my notification, recordkeeping, and reporting requirements?

Other Requirements and Information

§63.11586
Who implements and enforces this subpart?
§63.11587
What General Provisions sections apply to this subpart?
§63.11588
What definitions apply to this subpart?
Appendix
Table 1 of Subpart BBBBBBB of Part 63—Emission Reduction and PM Concentration Requirements
Appendix
Table 2 of Subpart BBBBBBB of Part 63—Initial Compliance Demonstration Methods With the Emission Reduction and PM Concentration Requirements
Appendix
Table 3 of Subpart BBBBBBB of Part 63—Test Methods
Appendix
Table 4 of Subpart BBBBBBB of Part 63—Continuous Compliance Demonstration Methods With the Emission Reduction and PM Concentration Requirements
Appendix
Table 5 of Subpart BBBBBBB of Part 63—Reporting Requirements
Appendix
Table 6 of Subpart BBBBBBB of Part 63—General Provisions
rule

Subpart CCCCCCC—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR AREA SOURCES: PAINTS AND ALLIED PRODUCTS MANUFACTURING

Applicability and Compliance Dates

§63.11599
Am I subject to this subpart?
§63.11600
What are my compliance dates?

Standards, Monitoring, and Compliance Requirements

§63.11601
What are the standards for new and existing paints and allied products manufacturing facilities?
§63.11602
What are the performance test and compliance requirements for new and existing sources?
§63.11603
What are the notification, reporting, and recordkeeping requirements?
§63.11604
[Reserved]

Other Requirements and Information

§63.11605
What General Provisions apply to this subpart?
§63.11606
Who implements and enforces this subpart?
§63.11607
What definitions apply to this subpart?
§§63.11608-63.11618
[Reserved]
Appendix
Table 1 to Subpart CCCCCCC of Part 63—Applicability of General Provisions to Paints and Allied Products Manufacturing Area Sources
rule

Subpart DDDDDDD—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR AREA SOURCES: PREPARED FEEDS MANUFACTURING

Applicability and Compliance Dates

§63.11619
Am I subject to this subpart?
§63.11620
What are my compliance dates?

Standards, Monitoring, and Compliance Requirements

§63.11621
What are the standards for new and existing prepared feeds manufacturing facilities?
§63.11622
What are the monitoring requirements for new and existing sources?
§63.11623
What are the testing requirements?
§63.11624
What are the notification, reporting, and recordkeeping requirements?

Other Requirements and Information

§63.11625
What parts of the General Provisions apply to my facility?
§63.11626
Who implements and enforces this subpart?
§63.11627
What definitions apply to this subpart?
§§63.11628-63.11638
[Reserved]
Appendix
Table 1 to Subpart DDDDDDD of Part 63—Applicability of General Provisions to Prepared Feeds Manufacturing Area Sources
rule

Subpart EEEEEEE—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS: GOLD MINE ORE PROCESSING AND PRODUCTION AREA SOURCE CATEGORY

Applicability and Compliance Dates

§63.11640
Am I subject to this subpart?
§63.11641
What are my compliance dates?

Standards and Compliance Requirements

§63.11645
What are my mercury emission standards?
§63.11646
What are my compliance requirements?
§63.11647
What are my monitoring requirements?
§63.11648
What are my notification, reporting, and recordkeeping requirements?

Other Requirements and Information

§63.11650
What General Provisions apply to this subpart?
§63.11651
What definitions apply to this subpart?
§63.11652
Who implements and enforces this subpart?
§63.11653
[Reserved]
Appendix
Table 1 to Subpart EEEEEEE of Part 63—Applicability of General Provisions to Subpart EEEEEE
rule

Subparts FFFFFF and GGGGGG [Reserved]

rule

Subpart HHHHHHH—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANT EMISSIONS FOR POLYVINYL CHLORIDE AND COPOLYMERS PRODUCTION

What This Subpart Covers

§63.11860
What is the purpose of this subpart?
§63.11865
Am I subject to the requirements in this subpart?
§63.11870
What is the affected source of this subpart?
§63.11871
What is the relationship to 40 CFR part 61, subpart F?
§63.11872
What is the relationship to other subparts in this part?
§63.11875
When must I comply with this subpart?

Emission Limits, Operating Limits and Work Practice Standards

§63.11880
What emission limits, operating limits and standards must I meet?

General Compliance Requirements

§63.11885
What parts of the General Provisions apply to me?
§63.11890
What are my additional general requirements for complying with this subpart?
§63.11895
How do I assert an affirmative defense for exceedance of emission standard during malfunction?
§63.11896
What am I required to do if I make a process change at my affected source?

Testing and Compliance Requirements

§63.11900
By what date must I conduct initial performance testing and monitoring, establish any applicable operating limits and demonstrate initial compliance with my emission limits and work practice standards?
§63.11905
When must I conduct subsequent performance testing and monitoring to demonstrate continuous compliance?
§63.11910
What are my initial and continuous compliance requirements for storage vessels?
§63.11915
What are my compliance requirements for equipment leaks?
§63.11920
What are my initial and continuous compliance requirements for heat exchange systems?
§63.11925
What are my initial and continuous compliance requirements for process vents?
§63.11930
What requirements must I meet for closed vent systems?
§63.11935
What CEMS and CPMS requirements must I meet to demonstrate initial and continuous compliance with the emission standards for process vents?
§63.11940
What continuous monitoring requirements must I meet for control devices required to install CPMS to meet the emission limits for process vents?
§63.11945
What performance testing requirements must I meet for process vents?
§63.11950
What emissions calculations must I use for an emission profile?
§63.11955
What are my initial and continuous compliance requirements for other emission sources?
§63.11956
What are my compliance requirements for ambient monitoring?
§63.11960
What are my initial and continuous compliance requirements for stripped resin?
§63.11965
What are my general compliance requirements for wastewater?
§63.11970
What are my initial compliance requirements for process wastewater?
§63.11975
What are my continuous compliance requirements for process wastewater?
§63.11980
What are the test methods and calculation procedures for process wastewater?

Notifications, Reports and Records

§63.11985
What notifications and reports must I submit and when?
§63.11990
What records must I keep?
§63.11995
In what form and how long must I keep my records?
§63.12000
Who implements and enforces this subpart?

Definitions

§63.12005
What definitions apply to this subpart?
§§63.12006-63.12099
[Reserved]
Appendix
Table 1 to Subpart HHHHHHH of Part 63—Emission Limits and Standards for Existing Affected Sources
Appendix
Table 2 to Subpart HHHHHHH of Part 63—Emission Limits and Standards for New Affected Sources
Appendix
Table 3 to Subpart HHHHHHH of Part 63—Summary of Control Requirements for Storage Vessels at New and Existing Sources
Appendix
Table 4 to Subpart HHHHHHH of Part 63—Applicability of the General Provisions to Part 63
Appendix
Table 5 to Subpart HHHHHHH of Part 63—Operating Parameters, Operating Limits and Data Monitoring, Recording and Compliance Frequencies for Process Vents
Appendix
Table 6 to Subpart HHHHHHH of Part 63—Toxic Equivalency Factors
Appendix
Table 7 to Subpart HHHHHHH of Part 63—Calibration and Accuracy Requirements for Continuous Parameter Monitoring Systems
Appendix
Table 8 to Subpart HHHHHHH of Part 63—Methods and Procedures for Conducting Performance Tests for Process Vents
Appendix
Table 9 to Subpart HHHHHHH of Part 63—Procedures for Conducting Sampling of Stripped Resin and Process Wastewater
Appendix
Table 10 to Subpart HHHHHHH of Part 63—HAP Subject to the Resin and Process Wastewater Provisions at New and Existing Sources
Appendix
Appendix A to Part 63—Test Methods Pollutant Measurement Methods From Various Waste Media
Appendix
Appendix B to Part 63—Sources Defined for Early Reduction Provisions
Appendix
Appendix C to Part 63—Determination of the Fraction Biodegraded (Fbio) in a Biological Treatment Unit
Appendix
Appendix D to Part 63—Alternative Validation Procedure for EPA Waste and Wastewater Methods
Appendix
Appendix E to Part 63—Monitoring Procedure for Nonthoroughly Mixed Open Biological Treatment Systems at Kraft Pulp Mills Under Unsafe Sampling Conditions


For questions or comments regarding e-CFR editorial content, features, or design, email ecfr@nara.gov.
For questions concerning e-CFR programming and delivery issues, email webteam@gpo.gov.