About GPO   |   Newsroom/Media   |   Congressional Relations   |   Inspector General   |   Careers   |   Contact   |   askGPO   |   Help  
 
Home   |   Customers   |   Vendors   |   Libraries  

The Electronic Code of Federal Regulations (e-CFR) is a regularly updated, unofficial editorial compilation of CFR material and Federal Register amendments produced by the National Archives and Records Administration's Office of the Federal Register (OFR) and the Government Printing Office.

Parallel Table of Authorities and Rules for the Code of Federal Regulations and the United States Code
Text | PDF

Find, review, and submit comments on Federal rules that are open for comment and published in the Federal Register using Regulations.gov.

Purchase individual CFR titles from the U.S. Government Online Bookstore.

Find issues of the CFR (including issues prior to 1996) at a local Federal depository library.

[2]
 
 

Electronic Code of Federal Regulations

blue pill

e-CFR Data is current as of September 30, 2014

Title 30Chapter IISubchapter BPart 250


TITLE 30—Mineral Resources

CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR

SUBCHAPTER B—OFFSHORE

PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF

rule

Subpart A—GENERAL

Authority and Definition of Terms

§250.101
Authority and applicability.
§250.102
What does this part do?
§250.103
Where can I find more information about the requirements in this part?
§250.104
How may I appeal a decision made under BSEE regulations?
§250.105
Definitions.

Performance Standards

§250.106
What standards will the Director use to regulate lease operations?
§250.107
What must I do to protect health, safety, property, and the environment?
§250.108
What requirements must I follow for cranes and other material-handling equipment?
§250.109
What documents must I prepare and maintain related to welding?
§250.110
What must I include in my welding plan?
§250.111
Who oversees operations under my welding plan?
§250.112
What standards must my welding equipment meet?
§250.113
What procedures must I follow when welding?
§250.114
How must I install and operate electrical equipment?
§§250.115-250.117
[Reserved]
§250.118
Will BSEE approve gas injection?
§250.119
[Reserved]
§250.120
How does injecting, storing, or treating gas affect my royalty payments?
§250.121
What happens when the reservoir contains both original gas in place and injected gas?
§250.122
What effect does subsurface storage have on the lease term?
§250.123
[Reserved]
§250.124
Will BSEE approve gas injection into the cap rock containing a sulphur deposit?

Fees

§250.125
Service fees.
§250.126
Electronic payment instructions.

Inspections of Operations

§250.130
Why does BSEE conduct inspections?
§250.131
Will BSEE notify me before conducting an inspection?
§250.132
What must I do when BSEE conducts an inspection?
§250.133
Will BSEE reimburse me for my expenses related to inspections?

Disqualification

§250.135
What will BSEE do if my operating performance is unacceptable?
§250.136
How will BSEE determine if my operating performance is unacceptable?

Special Types of Approvals

§250.140
When will I receive an oral approval?
§250.141
May I ever use alternate procedures or equipment?
§250.142
How do I receive approval for departures?
§§250.143-250.144
[Reserved]
§250.145
How do I designate an agent or a local agent?
§250.146
Who is responsible for fulfilling leasehold obligations?

Naming and Identifying Facilities and Wells (Does Not Include MODUs)

§250.150
How do I name facilities and wells in the Gulf of Mexico Region?
§250.151
How do I name facilities in the Pacific Region?
§250.152
How do I name facilities in the Alaska Region?
§250.153
Do I have to rename an existing facility or well?
§250.154
What identification signs must I display?
§§250.160-250.167
[Reserved]

Suspensions

§250.168
May operations or production be suspended?
§250.169
What effect does suspension have on my lease?
§250.170
How long does a suspension last?
§250.171
How do I request a suspension?
§250.172
When may the Regional Supervisor grant or direct an SOO or SOP?
§250.173
When may the Regional Supervisor direct an SOO or SOP?
§250.174
When may the Regional Supervisor grant or direct an SOP?
§250.175
When may the Regional Supervisor grant an SOO?
§250.176
Does a suspension affect my royalty payment?
§250.177
What additional requirements may the Regional Supervisor order for a suspension?

Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations

§250.180
What am I required to do to keep my lease term in effect?
§§250.181-250.185
[Reserved]

Information and Reporting Requirements

§250.186
What reporting information and report forms must I submit?
§250.187
What are BSEE's incident reporting requirements?
§250.188
What incidents must I report to BSEE and when must I report them?
§250.189
Reporting requirements for incidents requiring immediate notification.
§250.190
Reporting requirements for incidents requiring written notification.
§250.191
How does BSEE conduct incident investigations?
§250.192
What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
§250.193
Reports and investigations of possible violations.
§250.194
How must I protect archaeological resources?
§250.195
What notification does BSEE require on the production status of wells?
§250.196
Reimbursements for reproduction and processing costs.
§250.197
Data and information to be made available to the public or for limited inspection.

References

§250.198
Documents incorporated by reference.
§250.199
Paperwork Reduction Act statements—information collection.
rule

Subpart B—PLANS AND INFORMATION

General Information

§250.200
Definitions.
§250.201
What plans and information must I submit before I conduct any activities on my lease or unit?
§§250.202-250.203
[Reserved]
§250.204
How must I protect the rights of the Federal government?
§250.205
Are there special requirements if my well affects an adjacent property?

Post-Approval Requirements for the EP, DPP, and DOCD

§250.282
Do I have to conduct post-approval monitoring?

Deepwater Operations Plan (DWOP)

§250.286
What is a DWOP?
§250.287
For what development projects must I submit a DWOP?
§250.288
When and how must I submit the Conceptual Plan?
§250.289
What must the Conceptual Plan contain?
§250.290
What operations require approval of the Conceptual Plan?
§250.291
When and how must I submit the DWOP?
§250.292
What must the DWOP contain?
§250.293
What operations require approval of the DWOP?
§250.294
May I combine the Conceptual Plan and the DWOP?
§250.295
When must I revise my DWOP?
rule

Subpart C—POLLUTION PREVENTION AND CONTROL

§250.300
Pollution prevention.
§250.301
Inspection of facilities.
rule

Subpart D—OIL AND GAS DRILLING OPERATIONS

General Requirements

§250.400
Who is subject to the requirements of this subpart?
§250.401
What must I do to keep wells under control?
§250.402
When and how must I secure a well?
§250.403
What drilling unit movements must I report?
§250.404
What are the requirements for the crown block?
§250.405
What are the safety requirements for diesel engines used on a drilling rig?
§250.406
What additional safety measures must I take when I conduct drilling operations on a platform that has producing wells or has other hydrocarbon flow?
§250.407
What tests must I conduct to determine reservoir characteristics?
§250.408
May I use alternative procedures or equipment during drilling operations?
§250.409
May I obtain departures from these drilling requirements?

Applying for a Permit To Drill

§250.410
How do I obtain approval to drill a well?
§250.411
What information must I submit with my application?
§250.412
What requirements must the location plat meet?
§250.413
What must my description of well drilling design criteria address?
§250.414
What must my drilling prognosis include?
§250.415
What must my casing and cementing programs include?
§250.416
What must I include in the diverter and BOP descriptions?
§250.417
What must I provide if I plan to use a mobile offshore drilling unit (MODU)?
§250.418
What additional information must I submit with my APD?

Casing and Cementing Requirements

§250.420
What well casing and cementing requirements must I meet?
§250.421
What are the casing and cementing requirements by type of casing string?
§250.422
When may I resume drilling after cementing?
§250.423
What are the requirements for pressure testing casing?
§250.424
What are the requirements for prolonged drilling operations?
§250.425
What are the requirements for pressure testing liners?
§250.426
What are the recordkeeping requirements for casing and liner pressure tests?
§250.427
What are the requirements for pressure integrity tests?
§250.428
What must I do in certain cementing and casing situations?

Diverter System Requirements

§250.430
When must I install a diverter system?
§250.431
What are the diverter design and installation requirements?
§250.432
How do I obtain a departure to diverter design and installation requirements?
§250.433
What are the diverter actuation and testing requirements?
§250.434
What are the recordkeeping requirements for diverter actuations and tests?

Blowout Preventer (BOP) System Requirements

§250.440
What are the general requirements for BOP systems and system components?
§250.441
What are the requirements for a surface BOP stack?
§250.442
What are the requirements for a subsea BOP system?
§250.443
What associated systems and related equipment must all BOP systems include?
§250.444
What are the choke manifold requirements?
§250.445
What are the requirements for kelly valves, inside BOPs, and drill-string safety valves?
§250.446
What are the BOP maintenance and inspection requirements?
§250.447
When must I pressure test the BOP system?
§250.448
What are the BOP pressure tests requirements?
§250.449
What additional BOP testing requirements must I meet?
§250.450
What are the recordkeeping requirements for BOP tests?
§250.451
What must I do in certain situations involving BOP equipment or systems?

Drilling Fluid Requirements

§250.455
What are the general requirements for a drilling fluid program?
§250.456
What safe practices must the drilling fluid program follow?
§250.457
What equipment is required to monitor drilling fluids?
§250.458
What quantities of drilling fluids are required?
§250.459
What are the safety requirements for drilling fluid-handling areas?

Other Drilling Requirements

§250.460
What are the requirements for conducting a well test?
§250.461
What are the requirements for directional and inclination surveys?
§250.462
What are the requirements for well-control drills?
§250.463
Who establishes field drilling rules?

Applying for a Permit To Modify and Well Records

§250.465
When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?
§250.466
What records must I keep?
§250.467
How long must I keep records?
§250.468
What well records am I required to submit?
§250.469
What other well records could I be required to submit?

Hydrogen Sulfide

§250.490
Hydrogen sulfide.
rule

Subpart E—OIL AND GAS WELL-COMPLETION OPERATIONS

§250.500
General requirements.
§250.501
Definition.
§250.502
Equipment movement.
§250.503
Emergency shutdown system.
§250.504
Hydrogen sulfide.
§250.505
Subsea completions.
§250.506
Crew instructions.
§§250.507-250.508
[Reserved]
§250.509
Well-completion structures on fixed platforms.
§250.510
Diesel engine air intakes.
§250.511
Traveling-block safety device.
§250.512
Field well-completion rules.
§250.513
Approval and reporting of well-completion operations.
§250.514
Well-control fluids, equipment, and operations.
§250.515
What BOP information must I submit?
§250.516
Blowout prevention equipment.
§250.517
Blowout preventer system tests, inspections, and maintenance.
§250.518
Tubing and wellhead equipment.

Casing Pressure Management

§250.519
What are the requirements for casing pressure management?
§250.520
How often do I have to monitor for casing pressure?
§250.521
When do I have to perform a casing diagnostic test?
§250.522
How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
§250.523
When do I have to repeat casing diagnostic testing?
§250.524
How long do I keep records of casing pressure and diagnostic tests?
§250.525
When am I required to take action from my casing diagnostic test?
§250.526
What do I submit if my casing diagnostic test requires action?
§250.527
What must I include in my notification of corrective action?
§250.528
What must I include in my casing pressure request?
§250.529
What are the terms of my casing pressure request?
§250.530
What if my casing pressure request is denied?
§250.531
When does my casing pressure request approval become invalid?
rule

Subpart F—OIL AND GAS WELL-WORKOVER OPERATIONS

§250.600
General requirements.
§250.601
Definitions.
§250.602
Equipment movement.
§250.603
Emergency shutdown system.
§250.604
Hydrogen sulfide.
§250.605
Subsea workovers.
§250.606
Crew instructions.
§§250.607-250.608
[Reserved]
§250.609
Well-workover structures on fixed platforms.
§250.610
Diesel engine air intakes.
§250.611
Traveling-block safety device.
§250.612
Field well-workover rules.
§250.613
Approval and reporting for well-workover operations.
§250.614
Well-control fluids, equipment, and operations.
§250.615
What BOP information must I submit?
§250.616
Blowout prevention equipment.
§250.617
Blowout preventer system testing, records, and drills.
§250.618
What are my BOP inspection and maintenance requirements?
§250.619
Tubing and wellhead equipment.
§250.620
Wireline operations.
rule

Subpart G—[RESERVED]

rule

Subpart H—OIL AND GAS PRODUCTION SAFETY SYSTEMS

§250.800
General requirements.
§250.801
Subsurface safety devices.
§250.802
Design, installation, and operation of surface production-safety systems.
§250.803
Additional production system requirements.
§250.804
Production safety-system testing and records.
§250.805
Safety device training.
§250.806
Safety and pollution prevention equipment quality assurance requirements.
§250.807
Additional requirements for subsurface safety valves and related equipment installed in high pressure high temperature (HPHT) environments.
§250.808
Hydrogen sulfide.
rule

Subpart I—PLATFORMS AND STRUCTURES

General Requirements for Platforms

§250.900
What general requirements apply to all platforms?
§250.901
What industry standards must your platform meet?
§250.902
What are the requirements for platform removal and location clearance?
§250.903
What records must I keep?

Platform Approval Program

§250.904
What is the Platform Approval Program?
§250.905
How do I get approval for the installation, modification, or repair of my platform?
§250.906
What must I do to obtain approval for the proposed site of my platform?
§250.907
Where must I locate foundation boreholes?
§250.908
What are the minimum structural fatigue design requirements?

Platform Verification Program

§250.909
What is the Platform Verification Program?
§250.910
Which of my facilities are subject to the Platform Verification Program?
§250.911
If my platform is subject to the Platform Verification Program, what must I do?
§250.912
What plans must I submit under the Platform Verification Program?
§250.913
When must I resubmit Platform Verification Program plans?
§250.914
How do I nominate a CVA?
§250.915
What are the CVA's primary responsibilities?
§250.916
What are the CVA's primary duties during the design phase?
§250.917
What are the CVA's primary duties during the fabrication phase?
§250.918
What are the CVA's primary duties during the installation phase?

Inspection, Maintenance, and Assessment of Platforms

§250.919
What in-service inspection requirements must I meet?
§250.920
What are the BSEE requirements for assessment of fixed platforms?
§250.921
How do I analyze my platform for cumulative fatigue?
rule

Subpart J—PIPELINES AND PIPELINE RIGHTS-OF-WAY

§250.1000
General requirements.
§250.1001
Definitions.
§250.1002
Design requirements for DOI pipelines.
§250.1003
Installation, testing, and repair requirements for DOI pipelines.
§250.1004
Safety equipment requirements for DOI pipelines.
§250.1005
Inspection requirements for DOI pipelines.
§250.1006
How must I decommission and take out of service a DOI pipeline?
§250.1007
What to include in applications.
§250.1008
Reports.
§250.1009
Requirements to obtain pipeline right-of-way grants.
§250.1010
General requirements for pipeline right-of-way holders.
§250.1011
[Reserved]
§250.1012
Required payments for pipeline right-of-way holders.
§250.1013
Grounds for forfeiture of pipeline right-of-way grants.
§250.1014
When pipeline right-of-way grants expire.
§250.1015
Applications for pipeline right-of-way grants.
§250.1016
Granting pipeline rights-of-way.
§250.1017
Requirements for construction under pipeline right-of-way grants.
§250.1018
Assignment of pipeline right-of-way grants.
§250.1019
Relinquishment of pipeline right-of-way grants.
rule

Subpart K—OIL AND GAS PRODUCTION REQUIREMENTS

General

§250.1150
What are the general reservoir production requirements?

Well Tests and Surveys

§250.1151
How often must I conduct well production tests?
§250.1152
How do I conduct well tests?
§§250.1153-250.1155
[Reserved]

Approvals Prior to Production

§250.1156
What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
§250.1157
How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
§250.1158
How do I receive approval to downhole commingle hydrocarbons?

Production Rates

§250.1159
May the Regional Supervisor limit my well or reservoir production rates?

Flaring, Venting, and Burning Hydrocarbons

§250.1160
When may I flare or vent gas?
§250.1161
When may I flare or vent gas for extended periods of time?
§250.1162
When may I burn produced liquid hydrocarbons?
§250.1163
How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain?
§250.1164
What are the requirements for flaring or venting gas containing H2S?

Other Requirements

§250.1165
What must I do for enhanced recovery operations?
§250.1166
What additional reporting is required for developments in the Alaska OCS Region?
§250.1167
What information must I submit with forms and for approvals?
rule

Subpart L—OIL AND GAS PRODUCTION MEASUREMENT, SURFACE COMMINGLING, AND SECURITY

§250.1200
Question index table.
§250.1201
Definitions.
§250.1202
Liquid hydrocarbon measurement.
§250.1203
Gas measurement.
§250.1204
Surface commingling.
§250.1205
Site security.
rule

Subpart M—UNITIZATION

§250.1300
What is the purpose of this subpart?
§250.1301
What are the requirements for unitization?
§250.1302
What if I have a competitive reservoir on a lease?
§250.1303
How do I apply for voluntary unitization?
§250.1304
How will BSEE require unitization?
rule

Subpart N—OUTER CONTINENTAL SHELF CIVIL PENALTIES

Outer Continental Shelf Lands Act Civil Penalties

§250.1400
How does BSEE begin the civil penalty process?
§250.1401
Index table.
§250.1402
Definitions.
§250.1403
What is the maximum civil penalty?
§250.1404
Which violations will BSEE review for potential civil penalties?
§250.1405
When is a case file developed?
§250.1406
When will BSEE notify me and provide penalty information?
§250.1407
How do I respond to the letter of notification?
§250.1408
When will I be notified of the Reviewing Officer's decision?
§250.1409
What are my appeal rights?

Federal Oil and Gas Royalty Management Act Civil Penalties Definitions

§250.1450
What definitions apply to this subpart?

Penalties After a Period To Correct

§250.1451
What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease?
§250.1452
What if I correct the violation?
§250.1453
What if I do not correct the violation?
§250.1454
How may I request a hearing on the record on a Notice of Noncompliance?
§250.1455
Does my request for a hearing on the record affect the penalties?
§250.1456
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?

Penalties Without a Period To Correct

§250.1460
May I be subject to penalties without prior notice and an opportunity to correct?
§250.1461
How will BSEE inform me of violations without a period to correct?
§250.1462
How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct?
§250.1463
Does my request for a hearing on the record affect the penalties?
§250.1464
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?

General Provisions

§250.1470
How does BSEE decide what the amount of the penalty should be?
§250.1471
Does the penalty affect whether I owe interest?
§250.1472
How will the Office of Hearings and Appeals conduct the hearing on the record?
§250.1473
How may I appeal the Administrative Law Judge's decision?
§250.1474
May I seek judicial review of the decision of the Interior Board of Land Appeals?
§250.1475
When must I pay the penalty?
§250.1476
Can BSEE reduce my penalty once it is assessed?
§250.1477
How may BSEE collect the penalty?

Criminal Penalties

§250.1480
May the United States criminally prosecute me for violations under Federal oil and gas leases?

Bonding Requirements

§250.1490
What standards must my BOEM-specified surety instrument meet?
§250.1491
How will BOEM determine the amount of my bond or other surety instrument?

Financial Solvency Requirements

§250.1495
How do I demonstrate financial solvency?
§250.1496
How will BOEM determine if I am financially solvent?
§250.1497
When will BOEM monitor my financial solvency?
rule

Subpart O—WELL CONTROL AND PRODUCTION SAFETY TRAINING

§250.1500
Definitions.
§250.1501
What is the goal of my training program?
§250.1503
What are my general responsibilities for training?
§250.1504
May I use alternative training methods?
§250.1505
Where may I get training for my employees?
§250.1506
How often must I train my employees?
§250.1507
How will BSEE measure training results?
§250.1508
What must I do when BSEE administers written or oral tests?
§250.1509
What must I do when BSEE administers or requires hands-on, simulator, or other types of testing?
§250.1510
What will BSEE do if my training program does not comply with this subpart?
rule

Subpart P—SULPHUR OPERATIONS

§250.1600
Performance standard.
§250.1601
Definitions.
§250.1602
Applicability.
§250.1603
Determination of sulphur deposit.
§250.1604
General requirements.
§250.1605
Drilling requirements.
§250.1606
Control of wells.
§250.1607
Field rules.
§250.1608
Well casing and cementing.
§250.1609
Pressure testing of casing.
§250.1610
Blowout preventer systems and system components.
§250.1611
Blowout preventer systems tests, actuations, inspections, and maintenance.
§250.1612
Well-control drills.
§250.1613
Diverter systems.
§250.1614
Mud program.
§250.1615
Securing of wells.
§250.1616
Supervision, surveillance, and training.
§250.1617
Application for permit to drill.
§250.1618
Application for permit to modify.
§250.1619
Well records.
§250.1620
Well-completion and well-workover requirements.
§250.1621
Crew instructions.
§250.1622
Approvals and reporting of well-completion and well-workover operations.
§250.1623
Well-control fluids, equipment, and operations.
§250.1624
Blowout prevention equipment.
§250.1625
Blowout preventer system testing, records, and drills.
§250.1626
Tubing and wellhead equipment.
§250.1627
Production requirements.
§250.1628
Design, installation, and operation of production systems.
§250.1629
Additional production and fuel gas system requirements.
§250.1630
Safety-system testing and records.
§250.1631
Safety device training.
§250.1632
Production rates.
§250.1633
Production measurement.
§250.1634
Site security.
rule

Subpart Q—DECOMMISSIONING ACTIVITIES

General

§250.1700
What do the terms “decommissioning”, “obstructions”, and “facility” mean?
§250.1701
Who must meet the decommissioning obligations in this subpart?
§250.1702
When do I accrue decommissioning obligations?
§250.1703
What are the general requirements for decommissioning?
§250.1704
When must I submit decommissioning applications and reports?
§250.1705
What BOP information must I submit?
§250.1706
What are the requirements for blowout prevention equipment?
§250.1707
What are the requirements for blowout preventer system testing, records, and drills?
§250.1708
What are my BOP inspection and maintenance requirements?
§250.1709
What are my well-control fluid requirements?

Permanently Plugging Wells

§250.1710
When must I permanently plug all wells on a lease?
§250.1711
When will BSEE order me to permanently plug a well?
§250.1712
What information must I submit before I permanently plug a well or zone?
§250.1713
Must I notify BSEE before I begin well plugging operations?
§250.1714
What must I accomplish with well plugs?
§250.1715
How must I permanently plug a well?
§250.1716
To what depth must I remove wellheads and casings?
§250.1717
After I permanently plug a well, what information must I submit?

Temporary Abandoned Wells

§250.1721
If I temporarily abandon a well that I plan to re-enter, what must I do?
§250.1722
If I install a subsea protective device, what requirements must I meet?
§250.1723
What must I do when it is no longer necessary to maintain a well in temporary abandoned status?

Removing Platforms and Other Facilities

§250.1725
When do I have to remove platforms and other facilities?
§250.1726
When must I submit an initial platform removal application and what must it include?
§250.1727
What information must I include in my final application to remove a platform or other facility?
§250.1728
To what depth must I remove a platform or other facility?
§250.1729
After I remove a platform or other facility, what information must I submit?
§250.1730
When might BSEE approve partial structure removal or toppling in place?
§250.1731
Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE?

Site Clearance for Wells, Platforms, and Other Facilities

§250.1740
How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions?
§250.1741
If I drag a trawl across a site, what requirements must I meet?
§250.1742
What other methods can I use to verify that a site is clear?
§250.1743
How do I certify that a site is clear of obstructions?

Pipeline Decommissioning

§250.1750
When may I decommission a pipeline in place?
§250.1751
How do I decommission a pipeline in place?
§250.1752
How do I remove a pipeline?
§250.1753
After I decommission a pipeline, what information must I submit?
§250.1754
When must I remove a pipeline decommissioned in place?
rule

Subpart R—[RESERVED]

rule

Subpart S—SAFETY AND ENVIRONMENTAL MANAGEMENT SYSTEMS (SEMS)

§250.1900
Must I have a SEMS program?
§250.1901
What is the goal of my SEMS program?
§250.1902
What must I include in my SEMS program?
§250.1903
Acronyms and definitions.
§250.1904
Special instructions.
§§250.1905-250.1908
[Reserved]
§250.1909
What are management's general responsibilities for the SEMS program?
§250.1910
What safety and environmental information is required?
§250.1911
What hazards analysis criteria must my SEMS program meet?
§250.1912
What criteria for management of change must my SEMS program meet?
§250.1913
What criteria for operating procedures must my SEMS program meet?
§250.1914
What criteria must be documented in my SEMS program for safe work practices and contractor selection?
§250.1915
What training criteria must be in my SEMS program?
§250.1916
What criteria for mechanical integrity must my SEMS program meet?
§250.1917
What criteria for pre-startup review must be in my SEMS program?
§250.1918
What criteria for emergency response and control must be in my SEMS program?
§250.1919
What criteria for investigation of incidents must be in my SEMS program?
§250.1920
What are the auditing requirements for my SEMS program?
§250.1921
What qualifications must the ASP meet?
§250.1922
What qualifications must an AB meet?
§250.1923
[Reserved]
§250.1924
How will BSEE determine if my SEMS program is effective?
§250.1925
May BSEE direct me to conduct additional audits?
§250.1926
[Reserved]
§250.1927
What happens if BSEE finds shortcomings in my SEMS program?
§250.1928
What are my recordkeeping and documentation requirements?
§250.1929
What are my responsibilities for submitting OCS performance measure data?
§250.1930
What must be included in my SEMS program for SWA?
§250.1931
What must be included in my SEMS program for UWA?
§250.1932
What are my EPP requirements?
§250.1933
What procedures must be included for reporting unsafe working conditions?